Render of the new warehouse addition Render of the new warehouse addition

Warehouse Addition

NGK Spark Plugs USA requested Pickering Associates provide complete construction and permit drawings for the expansion/addition of an existing warehouse facility. The building was designed with additional roof loading for the addition of a Solar Panel Array in the future.

PROJECT DETAILS
    • Location: Sissonville, West Virginia
    • Type: Renovation
    • Size: 75,000 SF
    • Contractor: Grae Con Construction, Inc. / Brewer &Company of WV, Inc.
PROJECT SERVICES
    • Architecture
    • Civil Engineering
    • Electrical Engineering
    • Mechanical Engineering
    • Structural Engineering
    • Piping
    • Project Management
    • Construction Management

Our vast experience in construction management allowed the project to be completed with less than 2% in construction change orders.

The new facility is a pre-engineered metal building (PEMB) of approximately 75,000 square feet. The main warehouse space includes six loading docks. The floor slab was designed to accommodate a 20,000 lb. fork truck and includes precision leveling across approximately half of the new floor. The new warehouse space is heated only; however, the structure was designed for the installation of future roof-mounted HVAC equipment that will include cooling capabilities.

The facility was designed to tie-in to the existing building at roof level with a 26’-0” minimum interior clear height. Approximately 2,000 SF of the new space was also designed as a single-story office area and includes an employee break room, restrooms, and office administrative areas.