Washington Electric Co-op

2017-07-13T14:22:10-05:00

Washington Electric Co-op Pickering Associates was contracted to provide design-build services for a new 30,000 SF LEED certified office and warehouse building for Washington Electric Cooperative. The Client had outgrown their existing facility and was utilizing more than one location to house their operations. This new building allowed the client to maintain all [...]

WVUP Downtown Center

2017-07-13T13:57:55-05:00

WVUP Downtown Center Pickering Associates assisted West Virginia University with the phased renovations of their new Downtown Center. The building is a 1930s era utilitarian commercial property in the heart of Downtown Parkersburg. Each phase was performed as the university received the grants and funding required. The first phase of design entailed the [...]

WVUP Theatre Renovation

2017-07-13T15:14:48-05:00

WVUP Theatre Renovation West Virginia University at Parkersburg approached Pickering Associates to do preliminary design to renovate their theater. Conceptual design including the replacement of the interior finishes, stage floor, new acoustical studies for wall and ceiling arrays, other acoustical treatments and selective demolition of existing theater components were all part of the [...]

Polymer Alliance Zone

2017-07-13T12:38:39-05:00

Polymer Alliance Zone The Polymer Alliance Zone contracted with Pickering Associates to build a 100,000 square foot pre-engineered warehouse building to increase the available space to lease in the Polymer Technology Park.  The project was funded through a WV Economic Development Administration (WVEDA). The Pickering Associates team reviewed the project site and made [...]

Marietta College Physician’s Assistant Program Building

2017-07-13T10:24:06-05:00

Marietta College Physician’s Assistant Program Building Marietta College teamed up with Pickering Associates and Silverheels Construction after they purchased a local building formerly owned by the Moose Lodge with the intention of renovating it for use by their Physician’s Assistant Program. The existing building consisted of three floors, the first has approximately 16, [...]

Excited about your
upcoming Project?
Let’s Start Planning